• HOME
  • Aircraft
    • AIRFRAMES
      • Proud to fly a Turboprop: Q400 vs ATR72
      • Airbus A320 Experience
    • SYSTEMS
      • Pratt and Whitney PW1100G Geared Turbofan Engine
      • Winglets and Sharklets
      • Cockpit Design: EPR v/s N1 indication
      • Boeing’s MAX, Southwest’s 737
      • GPS to the rescue!
    • ACCIDENTS AND INCIDENTS
      • LOT 767 Gear Up Landing
      • Iran Air 743:Partial Gear Up Landing
  • AIRLINE
    • ANALYSIS
      • IndiGo performs well in Q3’16, but is outshone by Q1’16
      • SpiceJet: Q1’16 Operational Financials Forecast
      • Vistara – Review & Analysis
      • AirAsia India – Q2FY15 performance and outlook
      • Q2 results and Prof. Sanjiv Kapoor’s introductory class on Airline Economics
      • SpiceJet in Q(2) – Great Performance in Testing Times.
      • Could SpiceJet have been profitable in FY2013-14?
      • Interlysis – AirAsia India and Mrithyunjaya Chandilya
      • A glimpse of Tony’s AirAsia India, and his success mantra
      • Interlysis with Shyson Thomas – Air Pegasus, Unplugged.
    • EVENTS
      • AirAsia India-and the competition-gets real
      • Spicejet’s inaugural Bangalore-Bangkok Run
      • Spicejet unveils the Q400s
    • HUMAN FACTORS
      • Dissatisfied Flightcrew
      • Love is in “the air”
      • Captain Dad and kid First Officer
      • Cathay’s Young Cabin Crew!
  • AVIATION
    • The Indian Aviation 2015 growth story deciphered
    • National Civil Aviation Policy 2015
      • Safety
      • Regional Connectivity Scheme (RCS)
      • The 5/20 Rule
      • Route Dispersal Guidelines
      • Scheduled Commuter Airlines (SCAs)
      • Aviation Education & Skill Development
    • 2014: A year flown by
    • 2013: A year flown by
    • Training
      • Familiarization Flights for ATCOs
      • A320 FFS LOFT Session
      • HINDUSTAN GROUP OF INSTITUTIONS: AN AVIATION UNIVERSITY
        • Hindustan Institute of Engineering and Technology (HIET)
        • Hindustan Institute of Technology & Science (HITS): Hindustan University
        • Orient Flight School (OFS)
      • IGRUA
      • NFTI: Rising to the Top, and how
      • Aerospace Engineering in India: the Gaps
      • Chief Flying Instructors
    • PEOPLE
      • Radka Máchová
      • Rodrigo David: The man behind some of the best A320 flightdeck videos
    • TECHNOLOGY
      • GAGAN: India’s first step to a Future Air Navigation System (FANS)
  • PROJECTS
    • AIRBUS TECH
      • About PAT
      • AIRCON/PRESSURIZATION/VENTILATION
      • AUTOFLIGHT
      • COMMUNICATION SYSTEMS
      • ELECTRICAL SYSTEMS
      • FIRE PROTECTION SYSTEMS
      • FLIGHT CONTROLS
      • FUEL SYSTEMS
      • HYDRAULIC SYSTEMS
      • ICE AND RAIN PROTECTION
      • LANDING GEAR
      • LIGHTS
      • OXYGEN
      • PNEUMATICS
      • APU
      • DOORS
      • POWER PLANT (IAE)
    • ATR9X
      • About ATR 9X
      • Logbook
      • Introduction
      • Fuselage
    • General Aviation Flight Simulator
    • Dual Cyliner Rotax Electronic Engine-Kill Switch
    • Making a Lynx Micro Headset Charger on the Go!
  • ABOUT
    • About The Flying Engineer
    • Advertising
    • Merchandise

The Flying Engineer

~ Technically and Operationally Commercial Aviation

The Flying Engineer

Tag Archives: Stability

C-Series Program Update: One Month after the first flight

18 Friday Oct 2013

Posted by theflyingengineer in Manufacturer

≈ 1 Comment

Tags

aircraft, Bombardier, C, Certification, Chief, CS100, CS300, Engineering, Flight, ground, Pilot, Progress, Series, Shimmy, Simulator, Stability, test, Vehicle, Vibration

C SeriesRobert “Rob” Dewar, Vice President and General Manager, C-Series, Bombardier Commercial Program, gave a brief insight into the certification program of the C-Series, one month after it’s first flight on the 16th of September, 2013.

The C-Series is poised to usher in a new era for Bombardier, while posing as a market threat for popular Airbus and Boeing single aisle aircraft.

There have been a total of 3 test flights till date.

Shimmy

The landing gear and certification tests have been completed for the shimmy. Shimmy is an unstable lateral (yaw) vibration, typically in the range of 10 to 30Hz, which can lead to structural damage and/or collapse of the landing gear. Landing gear as seen on aircraft such as the Airbus A320 family, Boeing 737NG family and the C-Series, among others, are twin wheeled cantilevered, and such landing gears may experience shimmy stability problems at low speeds, and must be tested to validate the design of the landing gear against shimmy.

The ground vibration test of the aircraft is in progress. This testing is part of the plane’s certification program. Selected parts of the aircraft are excited with an external oscillatory force. By observing the aircraft’s response to these vibrations, engineers can model the aircraft’s transfer functions and determine the airplane’s in-flight stability.

These tests results will be compiled and will determine when the airplane takes to the skies for the fourth time, when the test flight envelope will be further opened up. The last three flights have witnessed the C-Series reaching an altitude of 25,000ft, landing gear extension and retraction cycles, tests of both high lift devices: the slats and flaps, and other in-flight manoeuvres.

FTV1The aircraft’s performance an handling closely matches the predicted flight model in the simulator. Bombardier is using a Engineering Flight Simulator (ESIM),built by CAE, from the last one year to test actual flight systems and system controllers when integrated in the aircraft, such as the slat-flap computer, fly-by-wire computer, landing gear computer, APU-simulator, brake computers, the PW1500G Engine FADECs (Full Authority Digital Engine Computer), and so forth. Using this ESIM, the flight test program can rely a lot on the simulator to do a lot of the system and integration tests while also preparing flight test crew for various flight test exercises. This builds the confidence of the crew in the aircraft, while also helping complete real flight test exercises with higher success rates and lower risks. System testing has entered the certification testing phase.

Bombardier find the structural test results, in the certification phase, very pleasing. Testing on the cabin management system as well as the environmental control system are in progress.

The CS100 Flight Test Vehicles (FTV) 2, 3, 4, and 5, as well as the first production aircraft are in very advanced stages of final assembly at Mirabel. The larger CS-300’s first major fuselage section is being transported, expected to arrive at the presently non-optimised-for-the-C-Series Mirabel facility.

Which is why the construction of a new 667,000 sq-ft plant, located close to its current facilities in the vicinity of the airport in Mirabel, Quebec, entirely dedicated to the assembly of the CSeries family of aircraft, is progressing well.

Charles Ellis C Series PilotAccording to Charles “Chuck” Ellis, Chief Flight Test Pilot C-Series, emphasising on the need for so many flight test vehicles, “We say it’s (certification program) a one year program but within that one year we’ll probably be doing 5 years of work. We can take one year and 5 airplanes, or 5 airplanes and one year”

Now that the ESIM’s flight and system model has been verified, it will making the certification easier and faster by offering a lot of flexibility and bandwidth in the C-Series certification program, as it is almost like having a 6th airplane in the fleet.

Referred by:

Referred by:

Project:

Project:

In Depth Articles:

In Depth Articles:

In Depth Articles:

RSS Feed

RSS Feed RSS - Posts

RSS Feed RSS - Comments

The Flying Engineer’s tweets

  • Foreign brands delight. Airlines partnering with non-Indian brands (eg - in flight amenities) elicit a great respo… twitter.com/i/web/status/1… 1 day ago
  • @Rishul93 Same same, but cleaner. And I mean aerodynamically. No vortex generators near the leading edge. E190-E2. https://t.co/UKnsdLkxq1 1 day ago
  • @gurupratap @27saurabhsinha Bingo. 1 day ago
  • @DelhiSpotter @embraer @OfficialStarAir Love your eye for angles. 5 days ago
  • Realising Premium Economy is far from premium with a middle seat, Vistara 's collateral has deleted the middle seat… twitter.com/i/web/status/1… 6 days ago
Follow @TheFlyingEnggnr

Visit our Facebook Page

Visit our Facebook Page

Blog archives of The Flying Engineer

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 17,611 other subscribers

Site Statistics

  • 2,472,400 views

Top Posts & Pages

  • Pratt and Whitney PW1100G Geared Turbofan Engine
    Pratt and Whitney PW1100G Geared Turbofan Engine
  • Winglets and Sharklets
    Winglets and Sharklets
  • Cockpit Design: EPR v/s N1 indication
    Cockpit Design: EPR v/s N1 indication
  • LANDING GEAR
    LANDING GEAR
  • Proud to fly a Turboprop: Q400 vs ATR72
    Proud to fly a Turboprop: Q400 vs ATR72
  • AUTOFLIGHT
    AUTOFLIGHT
  • FUEL SYSTEMS
    FUEL SYSTEMS
  • HYDRAULIC SYSTEMS
    HYDRAULIC SYSTEMS
  • AIRCON/PRESSURIZATION/VENTILATION
    AIRCON/PRESSURIZATION/VENTILATION
  • POWER PLANT (IAE)
    POWER PLANT (IAE)

Recent Posts!

  • IndiGo receives its first Airbus A320neo at Toulouse
  • On the A320 Neo, if you’re unlucky, you’ve got the last row
  • Why the FIA’s case against the removal of the 5/20 rule is unjustified
  • Why the 90 seat Q400 had to be announced at the Singapore Air Show
  • Analysing IndiGo’s performance in Q3’16
  • Deciphering the 2015 Indian Aviation growth story
  • Air Costa receives its third Embraer E190 at Jordan
  • Why Jet Airways meant much for Brussels
  • Same aircraft family, different hands: Boeing 737NG flown by the Air Force and an airline
  • IndiGo to fly India’s longest daily domestic flight effective 7th January 2016

Blog at WordPress.com.

  • Follow Following
    • The Flying Engineer
    • Join 396 other followers
    • Already have a WordPress.com account? Log in now.
    • The Flying Engineer
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...