• HOME
  • Aircraft
    • AIRFRAMES
      • Proud to fly a Turboprop: Q400 vs ATR72
      • Airbus A320 Experience
    • SYSTEMS
      • Pratt and Whitney PW1100G Geared Turbofan Engine
      • Winglets and Sharklets
      • Cockpit Design: EPR v/s N1 indication
      • Boeing’s MAX, Southwest’s 737
      • GPS to the rescue!
    • ACCIDENTS AND INCIDENTS
      • LOT 767 Gear Up Landing
      • Iran Air 743:Partial Gear Up Landing
  • AIRLINE
    • ANALYSIS
      • IndiGo performs well in Q3’16, but is outshone by Q1’16
      • SpiceJet: Q1’16 Operational Financials Forecast
      • Vistara – Review & Analysis
      • AirAsia India – Q2FY15 performance and outlook
      • Q2 results and Prof. Sanjiv Kapoor’s introductory class on Airline Economics
      • SpiceJet in Q(2) – Great Performance in Testing Times.
      • Could SpiceJet have been profitable in FY2013-14?
      • Interlysis – AirAsia India and Mrithyunjaya Chandilya
      • A glimpse of Tony’s AirAsia India, and his success mantra
      • Interlysis with Shyson Thomas – Air Pegasus, Unplugged.
    • EVENTS
      • AirAsia India-and the competition-gets real
      • Spicejet’s inaugural Bangalore-Bangkok Run
      • Spicejet unveils the Q400s
    • HUMAN FACTORS
      • Dissatisfied Flightcrew
      • Love is in “the air”
      • Captain Dad and kid First Officer
      • Cathay’s Young Cabin Crew!
  • AVIATION
    • The Indian Aviation 2015 growth story deciphered
    • National Civil Aviation Policy 2015
      • Safety
      • Regional Connectivity Scheme (RCS)
      • The 5/20 Rule
      • Route Dispersal Guidelines
      • Scheduled Commuter Airlines (SCAs)
      • Aviation Education & Skill Development
    • 2014: A year flown by
    • 2013: A year flown by
    • Training
      • Familiarization Flights for ATCOs
      • A320 FFS LOFT Session
      • HINDUSTAN GROUP OF INSTITUTIONS: AN AVIATION UNIVERSITY
        • Hindustan Institute of Engineering and Technology (HIET)
        • Hindustan Institute of Technology & Science (HITS): Hindustan University
        • Orient Flight School (OFS)
      • IGRUA
      • NFTI: Rising to the Top, and how
      • Aerospace Engineering in India: the Gaps
      • Chief Flying Instructors
    • PEOPLE
      • Radka Máchová
      • Rodrigo David: The man behind some of the best A320 flightdeck videos
    • TECHNOLOGY
      • GAGAN: India’s first step to a Future Air Navigation System (FANS)
  • PROJECTS
    • AIRBUS TECH
      • About PAT
      • AIRCON/PRESSURIZATION/VENTILATION
      • AUTOFLIGHT
      • COMMUNICATION SYSTEMS
      • ELECTRICAL SYSTEMS
      • FIRE PROTECTION SYSTEMS
      • FLIGHT CONTROLS
      • FUEL SYSTEMS
      • HYDRAULIC SYSTEMS
      • ICE AND RAIN PROTECTION
      • LANDING GEAR
      • LIGHTS
      • OXYGEN
      • PNEUMATICS
      • APU
      • DOORS
      • POWER PLANT (IAE)
    • ATR9X
      • About ATR 9X
      • Logbook
      • Introduction
      • Fuselage
    • General Aviation Flight Simulator
    • Dual Cyliner Rotax Electronic Engine-Kill Switch
    • Making a Lynx Micro Headset Charger on the Go!
  • ABOUT
    • About The Flying Engineer
    • Advertising
    • Merchandise

The Flying Engineer

~ Technically and Operationally Commercial Aviation

The Flying Engineer

Tag Archives: Retrofit

First A320 in Asia to retrofit its aircraft with Sharklets

06 Wednesday Nov 2013

Posted by theflyingengineer in General Aviation Interest

≈ Leave a comment

Tags

A320, Airbus, days, First, kit, Retrofit, Sharklet, time, winglet

TigerAir_SharkTigerair of Singapore, in which Singapore Airlines has a stake of 32.8%, unveiled the first A320 aircraft to be retrofitted in Asia with Sharklets. Five A320s have already been delivered to Tigerair with Sharklet-ready wings, with the retrofit work being undertaken by Sepang Aircraft Engineering in Kuala Lumpur, Malaysia.

Sharklet-ready wings are already strengthened to the necessary levels to handle the bending and twisting forces introduced by the additional aerodynamic surface. The retrofit takes just 2 days for such ready wings. Non-sharklet ready wings will need at least 13 days of work with the sharklet-retrofit kit, which will be available only in 2015.

Jet Blue made “history” in the February of 2013 by being the first operator to perform a production retrofit, on its aircraft N821JB (MSN 5417 which first flew on the 1st of December, 2012). This aircraft was produced before MSN 5428, which is now registered as 9M-AQQ, flying for Air Asia, that had made “history” as the first Sharklet Equipped A320 to be delivered.

Factory fit and production retrofit can be better understood here.

In addition to its retrofitted aircraft, 9V-TRK (MSN 5697 delivered on the 26th of July 2013 to Tigerair), Tigerair will start taking delivery of production-fitted Sharklet aircraft later this year.

You can read more about Sharklets here.

Airbus launches Sharklet retrofit for in-service A320 Family aircraft

03 Sunday Nov 2013

Posted by theflyingengineer in Manufacturer

≈ Leave a comment

Tags

A320, Air, Airbus, Go, Indigo, Retrofit, Sharklet, Statistics, winglet

A320_Sharklet2Almost a year after the first Airbus A320 equipped with a sharklet was delivered, Airbus announced the launch of the sharklet retrofit program for in-service A320 aircraft, and will be available in 2015.

This retrofit includes reinforcing the wing structure and adding the Sharklet wingtip device. As part of the upgrade, the retrofit will lengthen the aircraft’s service life and thus maximise the operators’ return on investment for the Sharklet retrofit.

The extent of reinforcement and more details on the sharklets may be viewed here, in this comprehensive article on Winglets and Sharklets.

Airbus will offer the retrofit initially for A320 and A319 models and will evaluate a retrofit for the A321 at a later stage.

The Sharklets’ benefits include a fuel consumption reduction by up to 4 per cent (Only on long sectors), and an extension of mission range by 100 nautical miles or payload capability increase by up to 450 kilogrammes.

Sharklets equipped on new-build A320 Family aircraft have been delivered by Airbus since December 2012, with more than 184 received by customers and operators to date. MSN 5428 is the first sharklet equipped Airbus A320. In India, only two operators of the Airbus A320 feature sharklet equipped A320s in their fleet: IndiGo and GoAir.

In Indigo, VT-IFH onwards, up to the latest, VT-IFV feature sharklets. Out of 71 Airbus A320 in the airline’s fleet, 15 are equipped with sharklets.

In Go Air, VT-GOL onwards, up to the latest, VT-GOP feature sharklets. Out of 18 Airbus A320 in the airline’s fleet, 5 are equipped with sharklets.

There are 112 Airbus A320 in India (excluding A321 and A319), 17.8% of which are equipped with fuel-saving sharklets.

A320 Sharklets: Factory Installation vs Production Retrofit

18 Monday Mar 2013

Posted by theflyingengineer in General Aviation Interest

≈ Leave a comment

Tags

A320, Air Asia, Airbus, jetBlue, N821JB, Retrofit, Sharklet

New Airbus A320 family aircraft come with strengthened wings, ready for the increased aerodynamic loads the Sharklets impose on the wings. It is then up to the customer to choose for a factory installation of either the roughly US$1M winglets, or the standard wingtip fences.

Or, if the customer chooses to, may later swap the wingtip fences with the winglets (Airbus calls them Sharklets), in what is known as a Production Retrofit. The rettrofit kit adds to the cost of the Sharklets.

Jet Blue made “history” by being the first operator to perform a production retrofit, on its aircraft N821JB (MSN 5417 which first flew on the 1st of December, 2012). This aircraft was produced before MSN 5428, which is now registered as 9M-AQQ, flying for Air Asia, and made “history” as the first Sharklet Equipped A320 to be delivered.

The recently delivered A320s to JetBlue, which came without the Sharklets, take less than 2 days per aircraft to fit the Sharklets. However, the older A320s in its fleet, on which JetBlue wishes to fit Sharklets, will need structural modification to strengthen the wings, and will take an estimated 14-21 days at a MRO facility. Newer deliveries will have the Sharklets fitted at the factory.

Watch the two videos, to understand and appreciate the differences between the two ways in which you can strap on the Sharklets: either at the factory, or at your facility.

Referred by:

Referred by:

Project:

Project:

In Depth Articles:

In Depth Articles:

In Depth Articles:

RSS Feed

RSS Feed RSS - Posts

RSS Feed RSS - Comments

The Flying Engineer’s tweets

  • Couldn't have asked for a more glorious end. https://t.co/f9NYJgxYCL 2 weeks ago
  • Some hold the emergency door open. Regardless. twitter.com/mhdksafa/statu… 2 weeks ago
  • Embraer twitter.com/BrothaManBlack… 2 weeks ago
  • RT @jamiebsmith: Legroom is on point. Absolutely love the Embraer jets. https://t.co/wNpTJXm7uQ 2 weeks ago
  • @unraveaero @aditishahsays @AirLeaseCorp @Reuters @Airbus @Boeing Exactly what was on my mind but refrained from co… twitter.com/i/web/status/1… 2 weeks ago
Follow @TheFlyingEnggnr

Visit our Facebook Page

Visit our Facebook Page

Blog archives of The Flying Engineer

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 17,608 other subscribers

Site Statistics

  • 2,451,480 views

Top Posts & Pages

  • Pratt and Whitney PW1100G Geared Turbofan Engine
    Pratt and Whitney PW1100G Geared Turbofan Engine
  • Cockpit Design: EPR v/s N1 indication
    Cockpit Design: EPR v/s N1 indication
  • Winglets and Sharklets
    Winglets and Sharklets
  • Proud to fly a Turboprop: Q400 vs ATR72
    Proud to fly a Turboprop: Q400 vs ATR72
  • MIN and MAX Acceleration Height
    MIN and MAX Acceleration Height
  • AIRCON/PRESSURIZATION/VENTILATION
    AIRCON/PRESSURIZATION/VENTILATION
  • AUTOFLIGHT
    AUTOFLIGHT
  • HYDRAULIC SYSTEMS
    HYDRAULIC SYSTEMS
  • Fuselage
    Fuselage
  • Airbus A320NEO (A320-271N) receives Type Certification, IndiGo to soon receive first aircraft
    Airbus A320NEO (A320-271N) receives Type Certification, IndiGo to soon receive first aircraft

Recent Posts!

  • IndiGo receives its first Airbus A320neo at Toulouse
  • On the A320 Neo, if you’re unlucky, you’ve got the last row
  • Why the FIA’s case against the removal of the 5/20 rule is unjustified
  • Why the 90 seat Q400 had to be announced at the Singapore Air Show
  • Analysing IndiGo’s performance in Q3’16
  • Deciphering the 2015 Indian Aviation growth story
  • Air Costa receives its third Embraer E190 at Jordan
  • Why Jet Airways meant much for Brussels
  • Same aircraft family, different hands: Boeing 737NG flown by the Air Force and an airline
  • IndiGo to fly India’s longest daily domestic flight effective 7th January 2016

Blog at WordPress.com.

  • Follow Following
    • The Flying Engineer
    • Join 393 other followers
    • Already have a WordPress.com account? Log in now.
    • The Flying Engineer
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...