• HOME
  • Aircraft
    • AIRFRAMES
      • Proud to fly a Turboprop: Q400 vs ATR72
      • Airbus A320 Experience
    • SYSTEMS
      • Pratt and Whitney PW1100G Geared Turbofan Engine
      • Winglets and Sharklets
      • Cockpit Design: EPR v/s N1 indication
      • Boeing’s MAX, Southwest’s 737
      • GPS to the rescue!
    • ACCIDENTS AND INCIDENTS
      • LOT 767 Gear Up Landing
      • Iran Air 743:Partial Gear Up Landing
  • AIRLINE
    • ANALYSIS
      • IndiGo performs well in Q3’16, but is outshone by Q1’16
      • SpiceJet: Q1’16 Operational Financials Forecast
      • Vistara – Review & Analysis
      • AirAsia India – Q2FY15 performance and outlook
      • Q2 results and Prof. Sanjiv Kapoor’s introductory class on Airline Economics
      • SpiceJet in Q(2) – Great Performance in Testing Times.
      • Could SpiceJet have been profitable in FY2013-14?
      • Interlysis – AirAsia India and Mrithyunjaya Chandilya
      • A glimpse of Tony’s AirAsia India, and his success mantra
      • Interlysis with Shyson Thomas – Air Pegasus, Unplugged.
    • EVENTS
      • AirAsia India-and the competition-gets real
      • Spicejet’s inaugural Bangalore-Bangkok Run
      • Spicejet unveils the Q400s
    • HUMAN FACTORS
      • Dissatisfied Flightcrew
      • Love is in “the air”
      • Captain Dad and kid First Officer
      • Cathay’s Young Cabin Crew!
  • AVIATION
    • The Indian Aviation 2015 growth story deciphered
    • National Civil Aviation Policy 2015
      • Safety
      • Regional Connectivity Scheme (RCS)
      • The 5/20 Rule
      • Route Dispersal Guidelines
      • Scheduled Commuter Airlines (SCAs)
      • Aviation Education & Skill Development
    • 2014: A year flown by
    • 2013: A year flown by
    • Training
      • Familiarization Flights for ATCOs
      • A320 FFS LOFT Session
      • HINDUSTAN GROUP OF INSTITUTIONS: AN AVIATION UNIVERSITY
        • Hindustan Institute of Engineering and Technology (HIET)
        • Hindustan Institute of Technology & Science (HITS): Hindustan University
        • Orient Flight School (OFS)
      • IGRUA
      • NFTI: Rising to the Top, and how
      • Aerospace Engineering in India: the Gaps
      • Chief Flying Instructors
    • PEOPLE
      • Radka Máchová
      • Rodrigo David: The man behind some of the best A320 flightdeck videos
    • TECHNOLOGY
      • GAGAN: India’s first step to a Future Air Navigation System (FANS)
  • PROJECTS
    • AIRBUS TECH
      • About PAT
      • AIRCON/PRESSURIZATION/VENTILATION
      • AUTOFLIGHT
      • COMMUNICATION SYSTEMS
      • ELECTRICAL SYSTEMS
      • FIRE PROTECTION SYSTEMS
      • FLIGHT CONTROLS
      • FUEL SYSTEMS
      • HYDRAULIC SYSTEMS
      • ICE AND RAIN PROTECTION
      • LANDING GEAR
      • LIGHTS
      • OXYGEN
      • PNEUMATICS
      • APU
      • DOORS
      • POWER PLANT (IAE)
    • ATR9X
      • About ATR 9X
      • Logbook
      • Introduction
      • Fuselage
    • General Aviation Flight Simulator
    • Dual Cyliner Rotax Electronic Engine-Kill Switch
    • Making a Lynx Micro Headset Charger on the Go!
  • ABOUT
    • About The Flying Engineer
    • Advertising
    • Merchandise

The Flying Engineer

~ Technically and Operationally Commercial Aviation

The Flying Engineer

Tag Archives: NCAP

Scheduled Commuter Airlines (SCAs) – A turning point in Indian Regional Aviation?

12 Thursday Nov 2015

Posted by theflyingengineer in Airline

≈ 1 Comment

Tags

2015, Airline, Aviation, Civil, Commuter, lease, Ministry, National, NCAP, Policy, rates, Scheduled

NCAP 2015 Regional Aviation India

Till date, regional airlines in India have been looked upon in poor light, largely because of the past and the present. No regional airline in India has survived long, collapsing under the pressures of mismanagement and poor planning. Even today, the way in which regional airlines are both managed and run is disappointing.

The ministry’s proposal for Scheduled Commuter Airlines (SCAs), and the associated benefits, are huge. For one, SCAs will be able to enter into code shares with other airlines. This will be the starting point for capacity purchase agreements (CPAs) as seen in the US of A where mainline airlines contract commuter or regional airlines to offer last airport connectivity. It turns into a win-win for both mainline and the regional or commuter airline.

Yet, the paid up capital requirement, as stipulated by the ministry, reduces entry barriers. This will allow the “not-so-good” to enter the business, mismanage the business, ultimately leading to a collapse, non-payment of salaries, and the like. So how much does an airline require to run?

It depends on many factors. We look into market lease rates of popular aircraft, and the amount of money the airline is going to lose over a period of 2 years. The projections are based on statistical data derived from many airlines, and will make you appreciate how much an airline really needs. We also expand the aircraft set to include other, smaller, in production turboprops.

We invite you to learn more by clicking here.

Referred by:

Referred by:

Project:

Project:

In Depth Articles:

In Depth Articles:

In Depth Articles:

RSS Feed

RSS Feed RSS - Posts

RSS Feed RSS - Comments

The Flying Engineer’s tweets

  • Couldn't have asked for a more glorious end. https://t.co/f9NYJgxYCL 1 week ago
  • Some hold the emergency door open. Regardless. twitter.com/mhdksafa/statu… 1 week ago
  • Embraer twitter.com/BrothaManBlack… 1 week ago
  • RT @jamiebsmith: Legroom is on point. Absolutely love the Embraer jets. https://t.co/wNpTJXm7uQ 1 week ago
  • @unraveaero @aditishahsays @AirLeaseCorp @Reuters @Airbus @Boeing Exactly what was on my mind but refrained from co… twitter.com/i/web/status/1… 1 week ago
Follow @TheFlyingEnggnr

Visit our Facebook Page

Visit our Facebook Page

Blog archives of The Flying Engineer

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 17,608 other subscribers

Site Statistics

  • 2,447,889 views

Top Posts & Pages

  • Pratt and Whitney PW1100G Geared Turbofan Engine
    Pratt and Whitney PW1100G Geared Turbofan Engine
  • Cockpit Design: EPR v/s N1 indication
    Cockpit Design: EPR v/s N1 indication
  • Winglets and Sharklets
    Winglets and Sharklets
  • Proud to fly a Turboprop: Q400 vs ATR72
    Proud to fly a Turboprop: Q400 vs ATR72
  • FLIGHT CONTROLS
    FLIGHT CONTROLS
  • FUEL SYSTEMS
    FUEL SYSTEMS
  • AIRCON/PRESSURIZATION/VENTILATION
    AIRCON/PRESSURIZATION/VENTILATION
  • Airbus Tech
    Airbus Tech
  • On the A320 Neo, if you're unlucky, you've got the last row
    On the A320 Neo, if you're unlucky, you've got the last row
  • MIN and MAX Acceleration Height
    MIN and MAX Acceleration Height

Recent Posts!

  • IndiGo receives its first Airbus A320neo at Toulouse
  • On the A320 Neo, if you’re unlucky, you’ve got the last row
  • Why the FIA’s case against the removal of the 5/20 rule is unjustified
  • Why the 90 seat Q400 had to be announced at the Singapore Air Show
  • Analysing IndiGo’s performance in Q3’16
  • Deciphering the 2015 Indian Aviation growth story
  • Air Costa receives its third Embraer E190 at Jordan
  • Why Jet Airways meant much for Brussels
  • Same aircraft family, different hands: Boeing 737NG flown by the Air Force and an airline
  • IndiGo to fly India’s longest daily domestic flight effective 7th January 2016

Blog at WordPress.com.

  • Follow Following
    • The Flying Engineer
    • Join 393 other followers
    • Already have a WordPress.com account? Log in now.
    • The Flying Engineer
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...