• HOME
  • Aircraft
    • AIRFRAMES
      • Proud to fly a Turboprop: Q400 vs ATR72
      • Airbus A320 Experience
    • SYSTEMS
      • Pratt and Whitney PW1100G Geared Turbofan Engine
      • Winglets and Sharklets
      • Cockpit Design: EPR v/s N1 indication
      • Boeing’s MAX, Southwest’s 737
      • GPS to the rescue!
    • ACCIDENTS AND INCIDENTS
      • LOT 767 Gear Up Landing
      • Iran Air 743:Partial Gear Up Landing
  • AIRLINE
    • ANALYSIS
      • IndiGo performs well in Q3’16, but is outshone by Q1’16
      • SpiceJet: Q1’16 Operational Financials Forecast
      • Vistara – Review & Analysis
      • AirAsia India – Q2FY15 performance and outlook
      • Q2 results and Prof. Sanjiv Kapoor’s introductory class on Airline Economics
      • SpiceJet in Q(2) – Great Performance in Testing Times.
      • Could SpiceJet have been profitable in FY2013-14?
      • Interlysis – AirAsia India and Mrithyunjaya Chandilya
      • A glimpse of Tony’s AirAsia India, and his success mantra
      • Interlysis with Shyson Thomas – Air Pegasus, Unplugged.
    • EVENTS
      • AirAsia India-and the competition-gets real
      • Spicejet’s inaugural Bangalore-Bangkok Run
      • Spicejet unveils the Q400s
    • HUMAN FACTORS
      • Dissatisfied Flightcrew
      • Love is in “the air”
      • Captain Dad and kid First Officer
      • Cathay’s Young Cabin Crew!
  • AVIATION
    • The Indian Aviation 2015 growth story deciphered
    • National Civil Aviation Policy 2015
      • Safety
      • Regional Connectivity Scheme (RCS)
      • The 5/20 Rule
      • Route Dispersal Guidelines
      • Scheduled Commuter Airlines (SCAs)
      • Aviation Education & Skill Development
    • 2014: A year flown by
    • 2013: A year flown by
    • Training
      • Familiarization Flights for ATCOs
      • A320 FFS LOFT Session
      • HINDUSTAN GROUP OF INSTITUTIONS: AN AVIATION UNIVERSITY
        • Hindustan Institute of Engineering and Technology (HIET)
        • Hindustan Institute of Technology & Science (HITS): Hindustan University
        • Orient Flight School (OFS)
      • IGRUA
      • NFTI: Rising to the Top, and how
      • Aerospace Engineering in India: the Gaps
      • Chief Flying Instructors
    • PEOPLE
      • Radka Máchová
      • Rodrigo David: The man behind some of the best A320 flightdeck videos
    • TECHNOLOGY
      • GAGAN: India’s first step to a Future Air Navigation System (FANS)
  • PROJECTS
    • AIRBUS TECH
      • About PAT
      • AIRCON/PRESSURIZATION/VENTILATION
      • AUTOFLIGHT
      • COMMUNICATION SYSTEMS
      • ELECTRICAL SYSTEMS
      • FIRE PROTECTION SYSTEMS
      • FLIGHT CONTROLS
      • FUEL SYSTEMS
      • HYDRAULIC SYSTEMS
      • ICE AND RAIN PROTECTION
      • LANDING GEAR
      • LIGHTS
      • OXYGEN
      • PNEUMATICS
      • APU
      • DOORS
      • POWER PLANT (IAE)
    • ATR9X
      • About ATR 9X
      • Logbook
      • Introduction
      • Fuselage
    • General Aviation Flight Simulator
    • Dual Cyliner Rotax Electronic Engine-Kill Switch
    • Making a Lynx Micro Headset Charger on the Go!
  • ABOUT
    • About The Flying Engineer
    • Advertising
    • Merchandise

The Flying Engineer

~ Technically and Operationally Commercial Aviation

The Flying Engineer

Tag Archives: Dreamliner

CSeries: The Narrowbody Dreamliner.

18 Saturday Jan 2014

Posted by theflyingengineer in Manufacturer, Operations

≈ Leave a comment

Tags

A319, A320, Analysis, CS300, CSeries, Delay, Dreamliner, Narrowbody, NEO

CSeries_MSN6

The first CS100 intended for commercial service being assembled.

Bombardier’s announcement: revising the entry into service (EIS) of the CSeries: came as a surprise to noone. You didn’t even need company insiders to leak information about the slow progress of the test flight campaign. The media front-ending is clue enough: the lack of updates, and the general lowly feeling : gave away a test flight campaign with nothing much to talk about.

Bombardier isn’t the first manufacturer to declare intensive test flight campaigns and program milestones, only to show the world that their program management planning wasn’t planned at all. The trend has been in alphabetical order: Airbus – Boeing – Bombardier. The Airbus A380 and the Boeing 787 programs talked of entry into service dates that were too good, only to be found later that that they were too good to be true.

For Airbus, the A380 was a first: in terms of size, wiring, and a level of coordination in design that was not well coordinated. For Boeing, the airplane was, technically, a new design, with many firsts: technical and production, leading to software issues, and supply issues.

The graph below shows how unique, technically challenging, and possibly operationally “disruptive” airplane programs, show longer periods between the first flight & entry into service (EIS). The A300 was Airbus’ first airplane; the A340 was Airbus’ first quad-jet. The A350 has nothing special about it: it builds upon the A380’s avionics & software; the only thing new is the extent of use of composites. 12 months for the program should be doable.

Aircraft porgram Delta FF EIS

Legend: Blue: Past programs, Red: programs with significant gap between FF & EIS, Orange: Programs in progress.

In comparison to the A380 and the 787 programs, the CSeries is a “stranger” airplane for Bombardier. It is Bombardier’s first all new airliner design (the CRJ series is a derivative of the Challenger  from Canadair, the Q400 is a modification of De-Havilland’s turboprop offering), the manufacturer’s first airplane so big, the first airplane in the world to fly with the PW1000G Geared Turbofan Engine (never before has such  a large GTF ever flown), the companies first fly-by-wire aircraft, Bombardier’s first foray into designing an all composite wing for a commercial aircraft, and the first use of Al-Li on such scale on a narrowbody aircraft.

It is so new, that it is to Bombardier what the 787 is to Boeing. A great airplane, promising excellent fuel savings, but exhibiting a huge leap in technology & process: a toxic combination that introduces too many variables in one go.

The CSeries program has pushed the first deliverers by nine months to the second half of 2015, taking the time between first flight and EIS to a projected 21 months. The CS300, is expected to enter service 6 months later.

That is terrible news for Bombardier: The CS300 is expected to enter service in early 2016.

The CSeries was the very aircraft that made Airbus and Boeing reengine their airplane. But with the A320NEO planned to enter service in 2015, the popular single aisle family, which members A319NEO and A320NEO compete directly & indirectly with the CS300, will be available earlier, and with a better appeal: thanks to a proven airframe: the A320 family’s. Considering that Airbus can afford upto 25% off on the list prices, the A319NEO can be sold for for US$70.8M, about US$7M costlier than the CS300’s list price. The CS300 burns lesser fuel than the A319NEO, and is expected to have the same operating cost per seat as the A320NEO. The CS300 still has an appeal: massive appeal. Technically that is, operationally: uncertain.

“We are taking the required time to ensure a flawless entry-into-service. We are very pleased that no major design changes have been identified, this gives us confidence that we will meet our performance targets,” said Mike Arcamone, President, Bombardier Commercial Aircraft.

But questions still linger in the minds of most: with so much so new to Bombardier, how reliable will the airplane be? Will the CSeries become the narrowbody “Dreamliner”?

Referred by:

Referred by:

Project:

Project:

In Depth Articles:

In Depth Articles:

In Depth Articles:

RSS Feed

RSS Feed RSS - Posts

RSS Feed RSS - Comments

The Flying Engineer’s tweets

  • Couldn't have asked for a more glorious end. https://t.co/f9NYJgxYCL 2 weeks ago
  • Some hold the emergency door open. Regardless. twitter.com/mhdksafa/statu… 2 weeks ago
  • Embraer twitter.com/BrothaManBlack… 2 weeks ago
  • RT @jamiebsmith: Legroom is on point. Absolutely love the Embraer jets. https://t.co/wNpTJXm7uQ 2 weeks ago
  • @unraveaero @aditishahsays @AirLeaseCorp @Reuters @Airbus @Boeing Exactly what was on my mind but refrained from co… twitter.com/i/web/status/1… 2 weeks ago
Follow @TheFlyingEnggnr

Visit our Facebook Page

Visit our Facebook Page

Blog archives of The Flying Engineer

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 17,608 other subscribers

Site Statistics

  • 2,451,490 views

Top Posts & Pages

  • Pratt and Whitney PW1100G Geared Turbofan Engine
    Pratt and Whitney PW1100G Geared Turbofan Engine
  • Cockpit Design: EPR v/s N1 indication
    Cockpit Design: EPR v/s N1 indication
  • Winglets and Sharklets
    Winglets and Sharklets
  • Proud to fly a Turboprop: Q400 vs ATR72
    Proud to fly a Turboprop: Q400 vs ATR72
  • AIRCON/PRESSURIZATION/VENTILATION
    AIRCON/PRESSURIZATION/VENTILATION
  • MIN and MAX Acceleration Height
    MIN and MAX Acceleration Height
  • AUTOFLIGHT
    AUTOFLIGHT
  • HYDRAULIC SYSTEMS
    HYDRAULIC SYSTEMS
  • Fuselage
    Fuselage
  • Airbus A320NEO (A320-271N) receives Type Certification, IndiGo to soon receive first aircraft
    Airbus A320NEO (A320-271N) receives Type Certification, IndiGo to soon receive first aircraft

Recent Posts!

  • IndiGo receives its first Airbus A320neo at Toulouse
  • On the A320 Neo, if you’re unlucky, you’ve got the last row
  • Why the FIA’s case against the removal of the 5/20 rule is unjustified
  • Why the 90 seat Q400 had to be announced at the Singapore Air Show
  • Analysing IndiGo’s performance in Q3’16
  • Deciphering the 2015 Indian Aviation growth story
  • Air Costa receives its third Embraer E190 at Jordan
  • Why Jet Airways meant much for Brussels
  • Same aircraft family, different hands: Boeing 737NG flown by the Air Force and an airline
  • IndiGo to fly India’s longest daily domestic flight effective 7th January 2016

Blog at WordPress.com.

  • Follow Following
    • The Flying Engineer
    • Join 393 other followers
    • Already have a WordPress.com account? Log in now.
    • The Flying Engineer
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...