• HOME
  • Aircraft
    • AIRFRAMES
      • Proud to fly a Turboprop: Q400 vs ATR72
      • Airbus A320 Experience
    • SYSTEMS
      • Pratt and Whitney PW1100G Geared Turbofan Engine
      • Winglets and Sharklets
      • Cockpit Design: EPR v/s N1 indication
      • Boeing’s MAX, Southwest’s 737
      • GPS to the rescue!
    • ACCIDENTS AND INCIDENTS
      • LOT 767 Gear Up Landing
      • Iran Air 743:Partial Gear Up Landing
  • AIRLINE
    • ANALYSIS
      • IndiGo performs well in Q3’16, but is outshone by Q1’16
      • SpiceJet: Q1’16 Operational Financials Forecast
      • Vistara – Review & Analysis
      • AirAsia India – Q2FY15 performance and outlook
      • Q2 results and Prof. Sanjiv Kapoor’s introductory class on Airline Economics
      • SpiceJet in Q(2) – Great Performance in Testing Times.
      • Could SpiceJet have been profitable in FY2013-14?
      • Interlysis – AirAsia India and Mrithyunjaya Chandilya
      • A glimpse of Tony’s AirAsia India, and his success mantra
      • Interlysis with Shyson Thomas – Air Pegasus, Unplugged.
    • EVENTS
      • AirAsia India-and the competition-gets real
      • Spicejet’s inaugural Bangalore-Bangkok Run
      • Spicejet unveils the Q400s
    • HUMAN FACTORS
      • Dissatisfied Flightcrew
      • Love is in “the air”
      • Captain Dad and kid First Officer
      • Cathay’s Young Cabin Crew!
  • AVIATION
    • The Indian Aviation 2015 growth story deciphered
    • National Civil Aviation Policy 2015
      • Safety
      • Regional Connectivity Scheme (RCS)
      • The 5/20 Rule
      • Route Dispersal Guidelines
      • Scheduled Commuter Airlines (SCAs)
      • Aviation Education & Skill Development
    • 2014: A year flown by
    • 2013: A year flown by
    • Training
      • Familiarization Flights for ATCOs
      • A320 FFS LOFT Session
      • HINDUSTAN GROUP OF INSTITUTIONS: AN AVIATION UNIVERSITY
        • Hindustan Institute of Engineering and Technology (HIET)
        • Hindustan Institute of Technology & Science (HITS): Hindustan University
        • Orient Flight School (OFS)
      • IGRUA
      • NFTI: Rising to the Top, and how
      • Aerospace Engineering in India: the Gaps
      • Chief Flying Instructors
    • PEOPLE
      • Radka Máchová
      • Rodrigo David: The man behind some of the best A320 flightdeck videos
    • TECHNOLOGY
      • GAGAN: India’s first step to a Future Air Navigation System (FANS)
  • PROJECTS
    • AIRBUS TECH
      • About PAT
      • AIRCON/PRESSURIZATION/VENTILATION
      • AUTOFLIGHT
      • COMMUNICATION SYSTEMS
      • ELECTRICAL SYSTEMS
      • FIRE PROTECTION SYSTEMS
      • FLIGHT CONTROLS
      • FUEL SYSTEMS
      • HYDRAULIC SYSTEMS
      • ICE AND RAIN PROTECTION
      • LANDING GEAR
      • LIGHTS
      • OXYGEN
      • PNEUMATICS
      • APU
      • DOORS
      • POWER PLANT (IAE)
    • ATR9X
      • About ATR 9X
      • Logbook
      • Introduction
      • Fuselage
    • General Aviation Flight Simulator
    • Dual Cyliner Rotax Electronic Engine-Kill Switch
    • Making a Lynx Micro Headset Charger on the Go!
  • ABOUT
    • About The Flying Engineer
    • Advertising
    • Merchandise

The Flying Engineer

~ Technically and Operationally Commercial Aviation

The Flying Engineer

Tag Archives: Blast Shield

Jet Blasting Away Operating Profits at Mumbai airport

01 Friday Feb 2013

Posted by theflyingengineer in General Aviation Interest, Manufacturer, Operations

≈ 3 Comments

Tags

27, A319, Airbus, Blast Shield, Blastwall, Jet, Mumbai, N1, Runway, Taxiway, VABB

A Jet Blast Shield, installed at Queenstown Airport, NZ. Image taken from Blastwall.

A Jet Blast Shield, installed at Queenstown Airport, NZ. Image taken from Blastwall.

A common practice at India is the misunderstanding of technical specifications. This leads to field failures. Further effort is spent into a turtle-paced probe of the failure, and till the probe is completed, inconveniences are caused; the inconveniences leading to losses, and the losses finally blamed upon the manufacturer whose specifications were misunderstood.

VABB_ARPTChhatrapati Shivaji International Airport, Mumbai (ICAO: VABB, IATA: BOM) has two physical runways, one running east-west (09-27), and the other one running north-west-south-east (32-14). The east end of 09-27 is very close to a road, and the Jhari Mari slum. The proximity to the road and slum poses a safety issue, when airplanes open power for takeoff.

The jet blast, from aircraft jet engines, have been demonstrated to cause significant damage to proximate objects, such as cars, and houses. (view the video towards the end of this article) The problem is amplified in larger, and heavier airplanes, that require a significantly greater amount of takeoff thrust.

For example, on an Airbus A320 (180 passengers, maximum takeoff weight up to 78 tonnes), with the CFM 56 Engines, exhaust velocities of upto 144km/h may be recorded at 500ft behind the aircraft. On an Airbus A330 (typically 335 passengers, maximum takeoff weight up to 235 tonnes), with the GE CF6-80E1 engines, exhaust velocities of upto 169km/h may be recorded at 500ft behind the aircraft. On an Airbus A380 (typically 525 passengers, maximum takeoff weight up to 560 tonnes), with the GP 7200 Engines, exhaust velocities of upto 169km/h may be recorded upto 720ft behind the aircraft. The A380, unlike the previous examples, has four engines, pushing a larger mass of air, and causing more potential damage.

Engine Exhaust Velocities at takeoff, Airbus A380

Engine Exhaust Velocities at takeoff, Airbus A380 with Trent 900 Engines

According to the Beaufort Scale of wind speeds, wind speeds in excess of 119 km/h cause “Severe structural damage to buildings”.

At Mumbai airport, when aircraft line up on runway 27 (easterly end) for a departure (takeoff), the closest approximate distance between the aircraft and a sufficiently busy road named “Magan Nathuram” is 500ft. With all sorts of vehicles: cars and tall, loaded trucks plying on the road, the risk of a jet blast’s direct and indirect damage to vehicles, and the adjacent slums, is very high, every time an aircraft takes off.

The Jet Blast shield located near the threshold of Runway 27. The visible gap in the centre is the portion that was jet-blasted away in 2012.

The Jet Blast shield located near the threshold of Runway 27. The visible gap in the centre is the portion that was jet-blasted away in 2012.

This necessitates a Jet Blast shield: a well designed barrier between the aircraft and the road. In 2011, a new Jet blast barrier from Blastwall, a Canadian firm, was installed. A year later, in the July of 2012, the shield gave way when a cargo plane tookoff. Along with the shield, the ILS Localizer array, located right behind the shield and responsible for Runway 09 operations, was damaged.

The Times of India brought out an article on this damaged shield, which may be read HERE.

N1_NOT_AVBL_FOR_OPSSince the July of 2012, the jet blast shield has been left damaged. Satellite images show the central section of the Jet Blast shield missing. The risk of a jet blast affecting civilians outside the airport perimeter has forced Mumbai airport to shut a part of taxiway “N1”, with the NOTAM A0900/12 stating: “PORTION OF TWY ‘N1’ EAST OF TWY ‘N3’ NOT AVBL FOR OPS”. While the ILS has been repaired, the Jet blast shield hasn’t  and as such, aircraft can line up on Runway 27 only via taxiway N3, displacing the take off point almost 1000ft ahead: a requirement to prevent Jet Blasting the locals away.

Interestingly, Blastwall has installed their shields at Toronto Pearson International Airport, and at Queenstown Airport. At Both airports, the installed jet blast shield is located greater than 530ft behind the estimated closest aircraft line up position. At Mumbai, the shield is located only about 400ft behind, subjecting it to greater stresses.

A statement from Peter Roston, President of Blastwall Ltd:

“We have provided frangible fibreglass blast walls to airports all over the world since 1998 and have never had a failure including here in Mumbai. Our specifications are clearly outlined on our web site and in fact were quoted in the purchase order we received for this wall originally. Unfortunately someone misunderstood the limitations as expressed on our site. As a result, once placed in operation, the wall was overstressed almost 100% from the specifications. Being frangible, it did as required and collapsed. In fact the wall performed exactly as designed. Both the president of our engineering company and myself flew to Mumbai to discuss the collapse , review the misunderstanding, and determine a path to correct this problem for the future. We suggested a drastically reinforced model. Eventually, after review of our specifications by the purchaser’s own engineers, this was approved and purchased. It was shipped some time ago and is at the site awaiting installation.”

The very fact that a new, reinforced jet blast shield was purchased is proof that the company was not held liable for a defective product. Peter agreed with the Flying Engineer’s view, stating, “There are only really two solutions: 1- build a stronger wall to contain a higher velocity and/or 2- move the aircraft further from the wall.”

The most frequently used runway for operations, 09-27, is 11,312ft long. A fully laden Boeing 747-400ER Freighter, at 412 Tonnes, requires around 11,000ft of runway to take off at sea level, at 32°C. With almost 1,000ft knocked off, the smaller available take off distance when departing from runway 27 (westerly direction), lowers the permissible takeoff weight of the 747-400ER by 10 tonnes.

TAKEOFF RUNWAY LENGTH REQUIREMENTS - 747-400ER (CF6-80C2B5F ENGINES)

TAKEOFF RUNWAY LENGTH REQUIREMENTS – 747-400ER (CF6-80C2B5F ENGINES)

NOTAM A0900/12 is still in effect, and this introduces a payload penalty for long haul operations of large aircraft.

To better appreciate what a Jetblast can do to a vehicle, watch this 50 second video, involving an Airbus A319 (Upto 75.5 Tonnes Maximum Take Off Weight, 156 Pasengers maximum seating capacity, 2 CFM 56-5 Engines producing a max thrust of around 12,000 kg force each):

Referred by:

Referred by:

Project:

Project:

In Depth Articles:

In Depth Articles:

In Depth Articles:

RSS Feed

RSS Feed RSS - Posts

RSS Feed RSS - Comments

The Flying Engineer’s tweets

  • Foreign brands delight. Airlines partnering with non-Indian brands (eg - in flight amenities) elicit a great respo… twitter.com/i/web/status/1… 1 day ago
  • @Rishul93 Same same, but cleaner. And I mean aerodynamically. No vortex generators near the leading edge. E190-E2. https://t.co/UKnsdLkxq1 1 day ago
  • @gurupratap @27saurabhsinha Bingo. 1 day ago
  • @DelhiSpotter @embraer @OfficialStarAir Love your eye for angles. 5 days ago
  • Realising Premium Economy is far from premium with a middle seat, Vistara 's collateral has deleted the middle seat… twitter.com/i/web/status/1… 6 days ago
Follow @TheFlyingEnggnr

Visit our Facebook Page

Visit our Facebook Page

Blog archives of The Flying Engineer

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 17,611 other subscribers

Site Statistics

  • 2,472,400 views

Top Posts & Pages

  • Pratt and Whitney PW1100G Geared Turbofan Engine
    Pratt and Whitney PW1100G Geared Turbofan Engine
  • Winglets and Sharklets
    Winglets and Sharklets
  • Cockpit Design: EPR v/s N1 indication
    Cockpit Design: EPR v/s N1 indication
  • LANDING GEAR
    LANDING GEAR
  • Proud to fly a Turboprop: Q400 vs ATR72
    Proud to fly a Turboprop: Q400 vs ATR72
  • AUTOFLIGHT
    AUTOFLIGHT
  • FUEL SYSTEMS
    FUEL SYSTEMS
  • HYDRAULIC SYSTEMS
    HYDRAULIC SYSTEMS
  • AIRCON/PRESSURIZATION/VENTILATION
    AIRCON/PRESSURIZATION/VENTILATION
  • POWER PLANT (IAE)
    POWER PLANT (IAE)

Recent Posts!

  • IndiGo receives its first Airbus A320neo at Toulouse
  • On the A320 Neo, if you’re unlucky, you’ve got the last row
  • Why the FIA’s case against the removal of the 5/20 rule is unjustified
  • Why the 90 seat Q400 had to be announced at the Singapore Air Show
  • Analysing IndiGo’s performance in Q3’16
  • Deciphering the 2015 Indian Aviation growth story
  • Air Costa receives its third Embraer E190 at Jordan
  • Why Jet Airways meant much for Brussels
  • Same aircraft family, different hands: Boeing 737NG flown by the Air Force and an airline
  • IndiGo to fly India’s longest daily domestic flight effective 7th January 2016

Blog at WordPress.com.

  • Follow Following
    • The Flying Engineer
    • Join 396 other followers
    • Already have a WordPress.com account? Log in now.
    • The Flying Engineer
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...